Steps of preparation and
placement of SSC
• Evaluate pre-operative occlusion
• Administer appropriate local anesthesia*
• Place rubber dam (clamp adjacent tooth)
• Removal of caries (if present)
• Crown preparation
• Selection and trial placement of SSC
• Contour and crimp (if necessary)
• Evaluate post-operative occlusion
• Cementation